TECHNICAL REPORT (Maintenance and signposting of hiking trails in Vayots Dzor region)

HIKEArmenia and Trails for Change Donation Contract 01․04․2019

Maintenance and signposting of hiking trails on segments

Gomk -Martiros, Old Martiros Loop, Kapuyt Loop Trail, Artavan Loop Trail

Technical report is to specify the work done by “Trails for Change” Tourism Infrastructure Development NGO in the period from 04.09.2019 to 18.09.2019 in the frame of HIKEArmenia and Trails for Change Donation contract (date: 01.04.2019). Intended work for this period was: 8 km of trail blazing, signposting, trail building, bush clearing of Gomk Martiros Trail, 6,5 km of signposting of Old Martiros Loop, 16 km of trail blazing of Artavan Loop, 13,6 km of signposting of Kapuyt Loop Trail.

The report will show the completed work.


COMPLETED WORKS

Gomk Martiros Trail

Table №1 Gomk Martiros Trail
Map#1. Gomk Martiros Trail

Old Martiros Loop

Table №2 Old Martiros Loop
Map#2 Old Martiros Loop

Kapuyt Loop Trail

Table №3 Kapuyt Loop Trail
Map#3 Kapuyt Loop Trail

Artavan Loop Trail

Table №4 Artavan Loop Trail
Map#4 Artavan Loop Trail

PHOTO REPORT




Prepared by “Trails for Change” Tourism Infrastructure Development NGO, on 16.10.2019 for HA Foundation

Anna Tadevosyan: TFC General Manager

Ashot Davtyan: TFC Project Manager

Aida Arakelyan: TFC Project Manager Assistant

Armen Manukyan: TFC Trail Crew Lead